Jackson
& Kelly - Written Agreement To
Correct Platinum Properties Original Thrasher Engineering's Fence
Supported Lateral Support |
Note:
In 2003, I spoke with this same Cincinnati
Insurance agent
about
Platinum Properties reluctance to correct Thrasher Engineering's
lateral locust grid fence line support area
before it
collapsed.
I informed the
insurance agent
that I offered Rich Lane the use of
our property without financial consideration in early 2003, which he
rebuffed.
It did not make sense to the Insurance Agent either why they would not correct the
area.
The
agent informed me that Cincinnati
Insurance was not going to insure
any further development for Platinum
Properties until they agreed to fix the area!
A meeting was held at Jackson and Kelly's office in Morgantown, WV.
My wife, an attorney and I attended. Platinum
Properties and Cincinnati
Insurance Company's counsel, along
with two
agents were also present.
(At the time, I was losing my vision and we did not
know the cause).
Attorney Eric London for Platinum Properties
could not take his eyes off of me. As he
provided a figure that their Engineer said it would
cost to repair the area without the use of our property.
(It was not until a year later that I learned
that their Engineer had not put forth such figures).
Attorney
George Stewart
for
Cincinnati Insurance
Company took the lead,
as Attorney Eric London shrunk
back.
They agreed to correct the area; build a support wall and divert the
drainage away from us and to the rear of 109 Platinum
Drive and leave an
access road.
The
work
was to be completed by September of 2005.
(Now, the drainage wording was that of Bridgeport
Public Works Supervisor that I had put in).
Now, we had been planning to construct a building and had already been delayed two years. However, the building would be directly
below the 113 Platinum Drive area whereas our Red Barn had too a
direct drainage hit from said area in 2003. We wanted to
start
our new buidling's construction this spring (2005).
Thus; all was agreeable.
Later
on our purported attoreny went over the agreement. However, I wanted to see Platinum Properties
Engineering plans for the retention wall. This
should have been readily available if Platinum Properties Engineer had
already stated the figure to correct the area. Their figure could only
have
come after reviewing two engineering plans. One with the use
of our property, another without. Our Attorney informed us that you would have to give them lee-way to correct the
area and they would have to build the
retention wall
to City of Bridgeport specifications.
We signed against my every instinct. We, along with every one else
would pay a steep price, as it took my ability to oversee all away.
Per the
Breeched,
(Now Irrelevant),
Written Agreement:
Permanent correction to
the area was to be completed by September 30, 2005.

|